Part 1: The module and the Tasks entity
Section titled “Part 1: The module and the Tasks entity”About this video
The first part of My First Application creates the Task Management module, which holds the whole application, and its Tasks entity. The entity gets a required title, a description, a Status category with three options, an assignee and a due date, laid out in two columns. The part ends by opening the add form to check the five fields.
What this video covers
- Adding a module and naming it in both languages; the normalized name is permanent
- Adding the Tasks data entity with an icon and its single and plural names
- Dragging field types from the palette onto Structure
- A required Text title, a description, a three-option Status category, an assignee and a due date
- A two-column layout in Form Settings
- Checking the result with Add Task
Who it’s for: App builder
Context
In the documentation: Create the module, Create the Tasks entity, Modules, Create and design an entity
Transcript
- A module holds one whole application. Let’s create ours.
- In Modules, select Add Module.
- Name it in both languages.
- The normalized name fills itself in. It is permanent, so keep it.
- Select Done, and open the new module.
- An entity is one kind of record. Select Add Data Entity.
- Name it Tasks, pick an icon, and set the single and plural names.
- Select Create. The entity’s designer opens.
- On Structure, drag field types in from the palette.
- A Text field for the title. It’s required.
- Then a description, a Status category with three options, the assignee, and a due date.
- In Form Settings, choose a two-column layout.
- Save, and confirm with Save Changes.
- Open Tasks and select Add Task: here is the form, with your five fields.
- That’s the foundation. In part two, Tasks gets its views and a page.
Platform 1.10.0 · Backend 1.11.0-alpha.11 · Frontend 1.11.0-alpha.6 · Mobile 1.10.2 · Chart 1.11.8 · Gateway 2.6.11 · MCP 0.2.0 · Grafana DS 1.2.0Docs build 2026-11-27